BU3

YAMAL LNG

YEARS DURATION

START

END

NAME OF PROJECT
YAMAL LNG

LOCATION
YAMAL – RUSSIA

NAME OF PROJECT
YAMAL LNG

LOCATION
YAMAL – RUSSIA

END USER
YAMAL LNG

SCOPE OF WORK – EQUIPMENT
Operation and Maintenance LNG Process Plant (3 Technological Lines). Main Equipment: GE Frame 7, BCL/MCL Compressors, HITACHI BOOSTER COMPRESSOR (21 MW), SUNDYNE SRL Compressors (2 stages – 5 MW); INGERSOL RAND SRL Compressors (4 stages – 2 MW); ARIEL – KERUI Reciprocating Compressors (1 MW 4 stages), Cyogenic Pumps EBARA, NIKKISO (1 MW). HORIZZONTAL PUMPS ITT (3 MW)

END USER
YAMAL LNG

SCOPE OF WORK – EQUIPMENT
Operation and Maintenance LNG Process Plant (3 Technological Lines). Main Equipment: GE Frame 7, BCL/MCL Compressors, HITACHI BOOSTER COMPRESSOR (21 MW), SUNDYNE SRL Compressors (2 stages – 5 MW); INGERSOL RAND SRL Compressors (4 stages – 2 MW); ARIEL – KERUI Reciprocating Compressors (1 MW 4 stages), Cyogenic Pumps EBARA, NIKKISO (1 MW). HORIZZONTAL PUMPS ITT (3 MW)

KEY OBJECTIVE
Availability and Reliability, Condition Monitoring, Continuous improvement and Management of Changes, Inspections, Material and Spare parts management, Reverse Engineering

FIELD SERVICE AND ENGINEERING ASSISTANCE
2 PAX

DURATION
8 Years – 2016 —> 2024

KEY OBJECTIVE
Availability and Reliability, Condition Monitoring, Continuous improvement and Management of Changes, Inspections, Material and Spare parts management, Reverse Engineering

FIELD SERVICE AND ENGINEERING ASSISTANCE
2 PAX

DURATION
8 Years – 2016 —> 2024