BU3

YAMAL LNG

DURATA IN ANNI

INIZIO

FINE

NOME DEL PROGETTO
YAMAL LNG

LUOGO
YAMAL – RUSSIA

NOME DEL PROGETTO
YAMAL LNG

LUOGO
YAMAL – RUSSIA

UTENTE FINALE
YAMAL LNG

AMBITO DI LAVORO – ATTREZZATURE
Operatività e manutenzione dell’impianto di processo GNL (3 linee tecnologiche). Attrezzatura principale: GE Frame 7, BCL/MCL Compressors, HITACHI BOOSTER COMPRESSOR (21 MW), SUNDYNE SRL Compressors (2 stages – 5 MW); INGERSOL RAND SRL Compressors (4 stages – 2 MW); ARIEL – KERUI Reciprocating Compressors (1 MW 4 stages), Cyogenic Pumps EBARA, NIKKISO (1 MW). POMPE ORIZZONTALI ITT (3 MW)

UTENTE FINALE
YAMAL LNG

AMBITO DI LAVORO – ATTREZZATURE
Operatività e manutenzione dell’impianto di processo GNL (3 linee tecnologiche). Attrezzatura principale: GE Frame 7, BCL/MCL Compressors, HITACHI BOOSTER COMPRESSOR (21 MW), SUNDYNE SRL Compressors (2 stages – 5 MW); INGERSOL RAND SRL Compressors (4 stages – 2 MW); ARIEL – KERUI Reciprocating Compressors (1 MW 4 stages), Cyogenic Pumps EBARA, NIKKISO (1 MW). POMPE ORIZZONTALI ITT (3 MW)

OBIETTIVO CHIAVE
Disponibilità e affidabilità, Condition Monitoring, Miglioramento continuo e Gestione delle modifiche, Ispezioni, Gestione materiali e ricambi, Reverse Engineering

SERVIZIO SUL CAMPO E ASSISTENZA INGEGNERIA
2 PAX

DURATA
8 Anni – 2016 —> 2024

OBIETTIVO CHIAVE
Disponibilità e affidabilità, Condition Monitoring, Miglioramento continuo e Gestione delle modifiche, Ispezioni, Gestione materiali e ricambi, Reverse Engineering

SERVIZIO SUL CAMPO E ASSISTENZA INGEGNERIA
2 PAX

DURATA
8 Anni – 2016 —> 2024